LD-PB460 high speed flexography printing hot glue binding exercise book production line
Function and features:
The machine adopts high and new technology such as double computer control, photoelectric tracking, gas-liquid interaction, human-machine interface touch screen operation and water ink flexographic printing. The double computer control systems can be operated at the same time or separately. Two systems control different parts and units. The water ink flexographic printing is environmental protection. The machine operation system is simple and intuitive interface, reasonable structure, reliable performance, easy to adjust.
The main processes of the machine are reel paper unwinding, high speed flexographic printing, vertical lines, cutting, folding, separate cutting, counting and overlapping, transferring, collating, milling groove, gluing top, gluing back, automatic cover feeding, cover casing, pressing and creasing and automatic finished book output. The machine is equipment for hot glue thin book batch production.
model : LD-PB460
printing width: 580-1020mm
printing speed: 240m/min
repeat printing length: 300- 670m
max transfer speed:50time/min
counting:5-50sheets
max. web diameter:1200mm
web weight: 45-180g/m2
min. binding size: 250 x 140mm
max. binding size: 460 x 300mm
binding thickness: 2 -15mm
cover weight: 80-250gsm
motor power: 30kw
total power: 50kw
machine weight:22ton
overall size : 24000mm x 3500mm x 2300mm
Components
1. |
REEL PAPER UNWINDING |
2. |
RULING AND PRINTING |
3. |
PERFORATION |
4. |
PAPER SLITTING |
5. |
SHEET FOLDING |
6. |
CROSSING CUTTING |
7. |
SHEET OVERLAPPING AND COUNTING |
8. |
TURNING |
9 |
GLUING |
10. |
PAPER COVER INSERT |
11 |
BINDING PAPER COVER |
12 |
PRESSING |
13 |
FINISH BOOKS READY TO CUT |
14 |
BOOK SEPARATING AND TRIMMING |
15. |
SINGLE FINISH BOOK COLLECT |
16. |
MAIN MOTOR |
17. |
MAIN MOTOR CONTROLING |
Configuration
NO. |
DESCRIPTION |
BRAND |
ORIGIN |
1 |
MAIN MOTOR |
HENGLI |
CHINA |
2 |
MAIN MOTOR CONTROLING |
OMRON |
JAPAN |
3 |
DC DRIVER |
PARKER |
UK |
Remark:
1. Delivery time:
Around 45 days after receiving the deposit before the shipment. Please contact us for the exact delivery time.
2. Installation and commissioning:
The seller is responsible for the installation and training. The buyer should cover the all of expense for the seller's engineers, such as air-tickets, accommodation, and medical expense and local traffic charges in Buyer's side. Besides, the buyer should do his best to cooperate in installation, supply the enough labors and tools, necessary accessory with them.
One engineer will be dispatched to the buyer place to work free for two weeks, for installing and training.
The training charge is free for two weeks, if the buyer needed to extend the training time, he must pay for the engineer as allowance.
3. Guarantee period and maintenance:
Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment.
Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing.
4. Packing and marking:
The machines are packed in wooden cases; all packing should protect the goods avoiding atmospheric influences.