Paper Processing > Stationery Manufacturing
Manufacturing of. Dewriting pads >
LD-P 1020
Fully Automatic Pad Machine
Fully automatic production system for the efficent
Manufacturing of writing pads in high volumes.
Applications:
Manufacturing of writing pads.
Products:
Glue-bound pads.
Wire-stitched pads (legal pad).
Writing pads with flap-over covers.
Remark:
1. Delivery time:
Around 45 days after receiving the deposit before the shipment. Please contact us for the exact delivery time.
2. Installation and commissioning:
The seller is responsible for the installation and training. The buyer should cover the all of expense for the seller's engineers, such as air-tickets, accommodation, and medical expense and local traffic charges in Buyer's side. Besides, the buyer should do his best to cooperate in installation, supply the enough labors and tools, necessary accessory with them.
One engineer will be dispatched to the buyer place to work free for two weeks, for installing and training.
The training charge is free for two weeks, if the buyer needed to extend the training time, he must pay for the engineer as allowance.
3. Guarantee period and maintenance:
Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment.
Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing.
4. Packing and marking:
The machines are packed in wooden cases; all packing should protect the goods avoiding atmospheric influences.
Remark:
1. Delivery time:
Around 45 days after receiving the deposit before the shipment. Please contact us for the exact delivery time.
2. Installation and commissioning:
The seller is responsible for the installation and training. The buyer should cover the all of expense for the seller's engineers, such as air-tickets, accommodation, and medical expense and local traffic charges in Buyer's side. Besides, the buyer should do his best to cooperate in installation, supply the enough labors and tools, necessary accessory with them.
One engineer will be dispatched to the buyer place to work free for two weeks, for installing and training.
The training charge is free for two weeks, if the buyer needed to extend the training time, he must pay for the engineer as allowance.
3. Guarantee period and maintenance:
Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment.
Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing.
4. Packing and marking:
The machines are packed in wooden cases; all packing should protect the goods avoiding atmospheric influences.
Refill pads.
Writing pads with covers drawn around (Block Rhodia).
Advantages:
Highest product quality by unsurpassed transport system in binding section.
High production output for large and medium runs.
High productivity with shortest change over times by electronic cut-off and sheet count adjustment.
Quick change of knives and central adjustment for cutting of UPS.
Centralized adjustment for size in binding section.
Options:
Deep pile delivery.
Flexo ruling/printing up to 4/4 per web.
Length perforation.
Semi-automatic machine starting from large sheet layer.
Drawing-on and Drawing-around of cover.
File hole drilling.
Separating cut for small-sized pads.
Cold glue application available.
Shred milling for permanent gluing.
DESCRIPTION |
BRAND |
ITEM NO. |
ORIGIN |
STAMPING ROLLER BEARING |
FAG |
RNU1011 |
GERMANY |
KNIFE LINEAR BEARING |
EASE |
SED60 |
JAPAN |
BEARING |
NSK |
2205 2206 |
|
KNIFE |
IKS |
|
SHANGHAI CHINA |
STITCHING HEAD |
HOHNER |
|
GERMANY |
CUTTING FLAT BELT |
HABASIT |
|
SWITZERLAND |
CUTTING SYNCHRONOUS BELT |
SOMGS |
|
GERMANY |
UNTRT |
|
JAPAN |
70A DC DRIVER |
PARKER |
590P/0070/500/0011/UK/ENW/0/0/000 |
UK |
PLC |
OMRON |
CTEL-M30-DR |
JAPAN |
PHOTOELECTRICITY SWITCH |
OMRON |
E3JK-R4M1 |
JAPAN |
CONTACTOR |
SCHNEIDER |
GV2ME05C |
FRANCE |
ENCODER |
GUANYANG |
|
CHINA |
ELECTROMAGNETIC CLUTCH |
XUNJIE |
|
CHINA |
DIRECT CURRENT MOTOR |
HENGLI |
|
CHINA |
MONITOR |
WEILUNTONG |
|
TAIWAN CHINA |
CHINA PNEUMATIC ELEMENT |
JIALING |
|
CHINA |
SOLENOID VALVE |
YZZ |
|
SINGAPORE |
OIL CYLINDER |
HUANQIU |
|
CHINA |
OIL PUMP |
RUIQING |
|
CHINA |
TRANSMISSION SHAFT |
CHICHENG |
|
CHINA |
FEEDER |
XINRUIZE |
|
CHINA |
Extra Free Standby Spare Parts
Name |
Qty |
Note |
Crosscut topknife |
1 |
Shanghai, China |
Separation topknife |
5 |
Shanghai, China |
Separation bottom knife |
5 |
Shanghai, China |
Slitting topknife |
1 |
Shanghai, China |
Slitting bottomknife |
1 |
Shanghai, China |
Green flat belt |
1 |
Haligonian,Switzerland |
Belt lacing machine |
1 |
Jiangsu, China |
Tool Case |
1 |
China |
Gears for counting |
3 |
China |