LDPB460 From Reel to Booklet
Full Automatic Hot Melt Glue Binding Notebook Making Machine
Equipment Function & Feature:
This machine utilizes advanced technology such as double computers control, photoelectric tracking, touch screen operation and water ink flexographic printing etc. The water ink flexographic printing is environmental protection. The equipment cover the production of middle school, primary school exercise books and other notebooks, machine is easy to operate. It produce the notebooks automatic. Every 10 hours can produce more than 60 thousand notebooks; only needing a team of 4 persons. This production line is an ideal choice for the mass production of hot melt glue bound notebooks.
Product Model |
LD-PB460 |
Overall Dimensions (L X W X H ) |
26000mm X 5500mm X 2300mm |
Web Width |
580~1200mm |
Max. Printing Speed |
240m/Min |
Repeat Printing Range |
300-670mm |
Max Output Speed |
50time/min |
Counting & Collating |
5-50 Sheet |
Max Reel Paper Diameter |
1200mm |
Sheet Weight |
45-180g |
Gluing Min.Size |
250 x 140mm |
Gluing Max.Size |
510 x 300mm |
Binding thickness |
2 -15mm |
Cover Weight |
80-250g |
Main Motor Power |
30kw |
Total Power |
50kw |
Machine Weight |
17ton |
Production Flow Chart:
1. Reel Paper Unwinding
2. Printing and Ruling
3. Cut Dotted Line
4. Paper Splitting
5. Page Folding
6. Page Slitting
7. Pages Counting
8. Paper Pile Delivery
9. Paper Collation
10.Milling Groove
11. Gluing Sides
12. Gluing Spine
13. Auto Cover Insertion
14. Cover Glued with Sheets
15. Spine Compression
16. Auto books Collation
17. Finished Product Collection
Remark:
1. Delivery time:
Around 45 days after receiving the deposit before the shipment. Please contact us for the exact delivery time.
2. Installation and commissioning:
The seller is responsible for the installation and training. The buyer should cover the all of expense for the seller's engineers, such as air-tickets, accommodation, and medical expense and local traffic charges in Buyer's side. Besides, the buyer should do his best to cooperate in installation, supply the enough labors and tools, necessary accessory with them.
One engineer will be dispatched to the buyer place to work free for two weeks, for installing and training.
The training charge is free for two weeks, if the buyer needed to extend the training time, he must pay for the engineer as allowance.
3. Guarantee period and maintenance:
Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment.
Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing.
4. Packing and marking:
The machines are packed in wooden cases; all packing should protect the goods avoiding atmospheric influences.